Painting and Decorating Made Easier!

How much time do you spend using specific skills and abilities?

A group of 150 painters completed a detailed questionnaire to determine how painters work in the 21st century. It was part of a research project.

 
Section I: Computation of amount of time that we actually work.  

Example:

1. Day-to-week: 8 hours/day x 5 days = 40 hours/1 week

2. Weeks-to-month: 40 hours/1 week x 4 weeks = 160 hours/1 month

3. Months-to-year: 160 hours/1 month x 11 months = 1760 hours/11 months

4. ADD: 40 hours x 2 weeks = 80 hours/ ½ month

5. Approximate Total Hours = 1840 hours/ 11 ½ months (excludes 80 hrs./vacation time).

 

Section II: Computation of how we spend our time, based on following information:

 

1. Paint skills and abilities used alone;

2. Paint skills and abilities in combination/simultaneously;

3. Paint movements and positions used alone;

4. Paint movements and positions used in combination/simultaneously;

5. Paint tools and equipment used alone;

6. Paint tools and equipment used in combination/simultaneously.

 

COMPUTATIONS FOR TEN OF THE QUESTIONS.

 

Note: All painters checked the box beside:  “My figures/estimates are on the low side.”

 

1. How many hours do you hold a paint brush?

A. 6 hrs./day x 5 days = 30 hrs./1 week

B. 30 hrs/1 wk. x 4 wks. = 120 hrs./1 month

C. 120 hrs/1 mo. x 11 mos. = 1320 hrs./11 months

D. ADD: 30 hrs x 2 wks. = 60 hrs./ ½ month

E. Approximate total hours: 1380 hrs./11 ½ months

 

2. How many hours do you use a spray gun?

A. 6.5 hrs./day x 5 days = 32.5 hrs./1 week

B. 32.5 hrs./1 wk. x 4 wks. = 130 hrs./1 month

C. 130 hrs./1 mo. x 11 mos. = 1430 hrs./11 months

D. ADD: 32.5 hrs./1 wk. x 2 wks. = 65 hrs./ ½ month

E. Approximate total hours: 1495 hrs./11 ½ months

 

3. How many hours do you stand?

A. 7 hrs./day x 5 days = 35 hrs./1 week

B. 35 hrs./1 wk. x 4 wks. = 140 hrs./1 month

C. 140 hrs./1 mo. x 11 mos. = 1540 hrs./11 months

D. ADD: 35 hrs. x 2 wks. = 70 hrs./ ½ month

E. Approximate total hours: 1610 hrs./11 ½ months.

 

4. How many hours do you carry?

A. 3 hrs./day x 5 days = 15 hrs./1 week

B. 15 hrs./1 wk. x 4 wks. = 60 hrs./1 month

C. 60 hrs./1 mo. x 11 mos. = 660 hrs./11 months

D. Add: 15 hrs. x 2 wks. = 30 hrs./ ½ month

E. Approximate total hours: 690 hrs./ 11 ½ months

 

5. How many hours do you lift?*

A. 3 hrs./day x 5 days = 15 hrs./1 week

B. 15 hrs. wk. x 4 wks. = 60 hrs./1 month

C. 60 hrs./1 mo. x 11 mos. = 660 hrs./11 months

D. Add: 15 hrs. x 2 wks. = 30 hrs./ ½ month

E. Approximate total hours: 690 hrs./ 11 ½ months

* Does not show the number of times painter lifts/carries combination of cans, buckets, tools, etc.

 

6. How many hours do you walk and/or step?

A. 5 hrs./day x 5 days = 25 hrs./1 week

B. 25 hrs./1 wk. x 4 wks. = 100 hrs./1 month

C. 100 hrs./1 mo. x 11 mos. = 1100 hrs./11 months

D. ADD: 25 hrs. x 2 wks. = 50 hrs./ ½ month

E. Approximate total hours: 1150 hrs./ 11 ½ months

 

7. How many hours do you climb?

A. 5 hrs./day x 5 days = 25 hrs./1 week

B. 25 hrs./1 wk. x 4 wks. = 100 hrs./1 month

C. 100 hrs./1 mo. x 11 mos. = 1100 hrs./11 months

D. ADD: 25 hrs. x 2 wks. = 50 hrs./ ½ month

E. Approximate total hours: 1150 hrs./ 11 ½ months

 

8. How many hours do you bend, kneel and/or crouch?

A. 3 hrs./day x 5 days = 15 hrs./1 week

B. 15 hrs./1 wk. x 4 wks. = 60 hrs./1 month

C. 60 hrs./1 mo. x 11 mos. = 660 hrs./ 11 months

D. ADD: 15 hrs. x 2 wks. = 30 hrs./ ½ month

E. Approximate total hours: 690 hrs./ 11 ½ months

 

9. How much weight do you lift?  * Does not include weight of container

A. Paint (gal) = 122 fl. ounces/7.6 lbs.

B. Paint (qt.) =   31 fl. ounces/1.94 lbs.

C. Paint (5 gal) = 620 fl. ounces/38/.7 lbs.

D. Ladder (6 ft./wood) =

E. Ladder (6 ft./alum.) =

F. Ladder (12 ft. extension/alum) =

G. Tool kit = 15 lbs.
* Does not show number of times painter is lifting/carrying combination of product cans, tools, and equipment at same time.

Examples:

A. 2 gal paint = 15.2 lbs.

B. 1 gal paint (7.6 lbs.) + 1 ladder/6 ft. aluminum (23.8 lbs.) = 31.4 lbs.

C. 1-5 gal. paint (38.8 lbs.) + 1 ladder 12-ft aluminum (69 lbs.) = 107.8 lbs.

D. 1-5 gal. paint (38.8 lbs.) + 1 spray gun + system (23.5 lbs.) = 63.9 lbs.

E. 1-gal paint (7.6 lbs.) + 1 tool (15 lbs.) = 21.6 lbs.

 

10. How many hours do you match paint colors to painted surfaces?

A. 0.5 hrs./day x 5 days = 2.5 hrs./1 week

B. 2.5 hrs./1 wk. x 4 wks. = 10 hrs./1 month

C. 10 hrs./1 mo. x 11 months = 110 hrs./ 11 months

D. ADD: 2.5 hrs./1 wk. x 2 wks. = 5 hrs./ ½ month

E. Approximate total hours: 115 hrs./11 ½ months

 

Section II included the following questions that required painters to calculate their time:

 

11. How many hours do you prepare surfaces? Ex: A. Filling/caulking, B. Sanding, C. Patching, D. Priming

12. How many hours do you spend cleaning preparation and painting tools?

13. How many hours do you repair painting tools and equipment?

14. How many hours do you use a computer?

15. How many hours do you use a mobile communication device?

16. How many hours do you use a calculator, or other computation device/software program? 

 

Section III required the painters to identify the skills/abilities and tasks they used simultaneously. Example: Painting – use brush – carry, then stand on ladder – carry 1 gallon of paint.

 

Then, painters needed to compute how much time they performed/used/did each part within that combination.

 

How will this data be used? Why is it important? Here’s a capsule view:

 

1. Federal and state agencies can determine how actual job descriptions for specific occupations have changed.

2. Wage/pay scale experts can identify changes in calculating actual task-to-time rates.

3. Educational, vocational and technical program developers determine real-world/real-time curricular needs of current and future workers.

4. Recruitment and employment specialists identify how to market and fill positions, based on a three-to-five year worker retention scale.

5. Industry manufacturers of products, materials, supplies, tools, equipment, etc. can better identify the needs of the specific types persons that will be using their products.

6. Health industry providers determine newer problem areas in symptomology, diagnosis, treatment, and prognosis; also project industry needs in patient care.

 

This particular research  project is still being conducted. Is it the type of project in which the average painter should participate? ABSOLUTELY!

 

******************************************************************************************

Build up your own profession, craft or trade – especially for the next generation!

******************************************************************************************

Thank you for visiting “Painting with Bob.”

Copyright 2016. Robert D. Hajtovik. All rights reserved.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Tag Cloud

%d bloggers like this: