Painting and Decorating Made Easier!

Archive for the ‘Hotel renovations’ Category

Renovating It: 108-Room Hotel

Cousins in the Indianapolis area purchased a 108-room hotel that needed a complete renovation. Structurally, both buildings were solid. No rotting, cracks, holes, breaks, etc.

 

The improvements could be made in stages. So the new owners decided to follow the wild suggestion of the drywall foreman under the construction management company:

 
“Replace nothing that still works, or can be restored. Unless it does not meet code…”

 

STAGE ONE: Bringing the entire property up to code.

 

This has required a large outlay of capital.

  1. New roof on the two building.
  2. New plumbing (copper tubing.
  3. New wiring, switches, sockets, plugs.
  4. Replacement of all A/C window units, and repair and rebuilding of main A/C systems on roofs.
  5. Replacement of stair and corridor steel railings and banisters.
  6. Resurfacing of pool and replacement of heaters.
  7. New security system, including videocam surveillance and computer systems.
  8. Replacement of one half of all wall joists and drywall in each front office.
  9. Replacement of two-thirds of all wall joists and drywall in each of seventy guest rooms.
  10. Repair and replacement of kitchen equipment.

 

STAGE TWO: Getting the hotel ready for occupancy.

  1. New carpeting in guest rooms and all public areas.
  2. Ceramic tile cleaning, repairing and polishing in 108 guest baths.
  3. New wi-fi wiring and routing system.
  4. Furniture repair and refurbishment in all guest rooms and public areas.
  5. Cabinetry and counter repair and re-laminating in all guest rooms.
  6. Fixture cleaning and restoration in all guest rooms, public areas and meeting rooms.
  7. Landscape revitalizations: clearing out, pruning, replanting, etc.
  8. Re-asphalting, striping and marking of parking and no-parking areas.

 

STAGE THREE: Repainting and refinishing of all exterior and interior surfaces.

  1. Cleaning and repairing of al wood and concrete surfaces.
  2. Prepping all surfaces: filling, patching, sanding, etc.
  3. Priming all metal surfaces, new lumber, bare metal, and stripped surfaces.
  4. Priming all new drywall and floating seams between new and existing drywall sections.
  5. Spray painting exterior walls, floors, doors, etc.
  6. Spray varnishing and clear coating all exterior wood decking, benches, built-in seating, fences, railings, signage frames, etc.
  7. Brushing or rolling of all fascia and trims.
  8. Popcorn spraying interior ceilings of front lobby, halls, offices, restaurant, public rooms, and meeting rooms.
  9. Spray painting all interior ceilings, walls, doors and trim in guest rooms and public areas.
  10. Brushing/rolling interior trim, wainscoting, baseboard, etc.
  11. Refinishing all wood cabinetry, shelving, mirror frames.
  12. Refinishing all wood furniture in public areas, also restaurant and two meeting rooms.

 

STAGE FOUR: Decorative finishing and covering of select areas.

  1. Marbleizing tops of tables in lobby, office reception area, meeting rooms’ central lounge.
  2. Installing wallpaper on back rotunda wall of front desk area.
  3. Faux finishing one wall in each bathroom of front office wing.
  4. Installing commercial grade wall vinyl in all public restrooms.
  5. Installing Indy-500 3-D scenic mural on main corridor of wall entering restaurant.

 

The 108-room hotel will reopen on November 1, 2017, in time for the holidays.

 

Several new, alluring amenities will grace the premises:

  1. Cyber library and graphics studio.
  2. Children’s WI -FI, 3-D “Pit Stop” studio.
  3. Self-service snack/night bar = foods, non-alcoholic beverages.
  4. Self-service laundry and dry cleaning center.
  5. Enclosed meditation flower garden and bird and butterfly sanctuary.

 

Terry, the oldest of the cousins in this new venture, becomes very animated when he talks about the hotel. At 54, he says that he has been learning many new lessons during “this exciting process.”

 

A few facts: Approximate cost of Stages 1-3: $2.1 million:

 

Construction management company: Over 30 years hotel/resort renovation experience.

Subcontractors: Selected per industry recommendations. No bidding.

Project tradespersons: All hired through respective local union offices.

New staff painter/decorator: Selected from painting crews that have worked on the project.

 

Question: How many other smaller hotels need a fresh, new start in life?

 

My belief: Older commercial properties hold just as much promise as older houses.

 

***********************************************************************************

Revitalizing and reusing older properties and structures deserves more of our attention.

***********************************************************************************
Thank you for visiting “Painting with Bob.”

Copyright 2017. Robert D. Hajtovik. All rights reserved.

Advertisements

Painting It: Accent Colors Change Appearance and Enhance Amenities

Every four years, a small chain of London area boutique hotels changes its color on the accent wall in each guest room. The owners believe that their clientele, largely repeat visitors, appreciate this gesture.

 

“They like the uplift,” emailed the company’s senior painter. “We are careful to select a color that is just coming into vogue.”

 

For 2017, the hotels’ owners have authorized their (three) staff painters to also apply the new accent color to the vanity alcove and nearby walk-in closet in each room. “This blends the different areas together…” the painter added.

 

The guest reviews have been very positive. Examples: “Lovely effect when entering bath area.”  “Most inviting color unity.”  “Pleasant add-on.”  “Delightful change.”

 

The senior painter ended his e-mail by saying, “I recommend the accent wall for any room or area. It enhances appearance and updates the décor at minimal cost…”

 

 

10 ADVANTAGES TO ADDING ACCENT COLORS TO DÉCOR

 

  1. It changes the overall appearance of the specific area, and entire room.
  2. It changes the overall “feel” of the room.
  3. It freshens the overall look of the entire room or suite.
  4. It enhances the benefits of the standard amenities in the room or area.
  5. It upgrades the overall design of the room or suite.
  6. It updates the color scheme in the room or suite.
  7. It expands the standard color scheme’s customer/guest appeal.
  8. It expands the area’s marketability.
  9. It offers positive visual change at a marginal cost.
  10. It offers a way to use up premium paint in colors no longer a part of color scheme.

 

 

10 UNIQUE APPLICATION TIPS FOR USING ACCENT COLORS

 

  1. Reverse the “apply accent color to the wall” rule. Apply the accent color to the trim, doors and frames, and window sills located on one wall.
  2. Spray paint the ceiling in the new accent color.
  3. Use accent color to faux finish a 3-inch border around the parameter of the ceiling.
  4. Create a vertical stripe effect by alternatively painting the accent color every 2 or 3 inches over the wall’s existing color.
  5. Create a drop ceiling effect by applying accent color in a 3 inch border around ceiling, then down 3 inches at the top of all four walls.
  6. Paint accent color on the worst-condition wall and/or trim surfaces in a room.
  7. Paint accent color adjacent to the surface in the worst condition – eg. dents, poorly matched to touch-ups, gouges, minor water damage.
  8. Hardwood and/or tile floors? Paint “pathway” from inside entry doorway all the way to the bathroom’s tub area. Note: A clear over coat may be advisable.
  9. Create draped canopy effect on bed wall by painting accent color in alternate space, from marked vertical center.
  10. Paint 3-inch block border around one wall in room, painting alternate blocks in accent color.

 

You get the picture. When it comes to applying accent paint colors, your options are wide open!

 

******************************************

Thank you for visiting “Painting with Bob.”

Copyright 2016. Robert D. Hajtovik. All rights reserved.

Painting Them: Theatres and Entertainment Areas

An area meant for entertainment should look the part.

 

All design elements should add to the total atmosphere. Every color, textile, and finish should serve as a backdrop for, or complement to, the theatre screen or stage area.

 

Special features: Low-dim-dark lighting; top acoustics; track lighting, colored lights; music for all types of moods – and sets the mood for movie or activity.

Construction elements: Create angles to walls and ceiling. Install cornices and crown molding; a multi-step wall base. Add a couple of columns for interest.

Design elements: Complementary toned-down installations: Seating upholstery/fabric, flooring, chrome. Gloss-over ceilings. TIP: Carpeting with subdued graphic design.

Special needs: Flat, non-reflective and non-distracting finishes and coverings on all surfaces and areas. Large, legible signage – eg. exit, traffic patterns, seating areas. Very accessible seating.

TIP: Bannisters, rails, etc. painted to be very visible for holding onto, and walking in dark area.

Color schemes: Complementary colors/tints/shades; soft earth tones with bright accent colors.

TIP: Bright colors work great in small areas.

Wood finishing: Bright colored stains, instead of earth tone colors.

Wallcoverings: Panoramic mural, abstract or realist; carpet wallcoverings; solid, or vertical-striped monochromatic textured panels, hung in alternate sections.

 

A FEW HOW-TO TIPS  

 

  1. Repair and maintenance: Re-glue loose wallpaper seams. Wash wallcoverings regularly; vacuum if wall carpeting used. Regularly, wash all metal surfaces – eg. chair arms, railings.
  2. Prepping: Sand all surfaces. Spackle small holes. Caulk all cracks.
  3. Painting and finishing: Ceilings – Flat latex or enamel. Decorating idea: Midnight blue like night sky, then glitter spray or hand-paint in stars. Walls – Dark tones, solid, complementary or monochromatic. Columns – Flat or eggshell enamel. Faux finish for style – eg. marbleizing, sponging, etchings.
  4.  Wallcoverings: Walls – Dark tones, same color or complementary. Columns – Cover in same wallcovering used on walls, to blend into décor. Use contrasting covering to make area stand out.
  5. Products, supplies, tools, equipment: Tools – Smoothing brushes; razor blade/ broad knives.
  6. Challenge: Preventing/reducing reflection of surfaces. Using wallcoverings that absorb the sound. Finding paints that add appeal and ambience, maximize durability, and tone down other surfaces (eg. railings).

 

The ambience of a theatre or entertainment area plays a vital role in its appeal, use, and popularity.

 

Are you the painter and decorator responsible for this area? Aim for top-quality prepping, painting and finishing, and maintenance results. So good that, when the lights are UP, persons see great workmanship, smooth surfaces, “seamless” wallcovering seams. A memorable scene!
Keep in mind: Many people use, and are associated with, these areas. Having surfaces that are low maintenance and very durable is essential. And, cost-effective in the long-term!

 

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

“Let us entertain you” includes the surfaces, as well as what’s on the screen, or on the stage.

* * * * * * * * ** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

Thank you for visiting “Painting with Bob.”

 

Copyright 2015. Robert D. Hajtovik. All rights reserved.

 

 

Painting Them: Inns and Bed and Breakfasts on Rue de les Fleurs. Part 1: Exteriors

An inn or bed and breakfast (chambre d’ hôte) occupies every building on the row of this Haute Alpes village, in southeast France. Each property’s owners live in a third or fourth story attic, or a small apartment behind the kitchens. Originally, each property was what we might call a “row house.”

 

Jean-Paul, my mother’s cousin, e-mailed about the property owners’ problems. “All of the buildings are in disrepair. Business is très mal (very bad). Soon, travelers will stay in other villages, or in the city.”

 

He e-mailed a detailed description of “les maisons pour les touriste stays” (houses for tourist stays). He drew a mental picture of the condition of the seven, tightly sandwiched structures. Cell phone photos followed. Red roofs canopied the five towers.

 

“What can we do?” he asked. “I’ve staged original productions in small theatres, including here. These touriste stays must not crumble to ruin. Tourism is the village’s main source of revenue.”

 

At first, I had no clue how to answer Jean-Paul’s question. How could we help? That French village was located over 4,480 miles away.

 

Then, an image appeared of the Seralago, a historic hotel in Kissimmee, Florida. Scaled down and reconfigured, it could have been the buildings on Rue de lès Fleurs. Their red-painted tower roofs announcing their formidable presence in the community.

 

The Seralago became the inspiration for an idea that sparkled with possibilities.

 

In June, I brainstormed with two painters at different Marriott-managed hotels. I mentioned the idea to my mother. (Caution!) And, she and Jean-Paul took it from there.

 

OVERALL PLAN – A Capsule Version

 

1. Designate two project leaders. One, for the exteriors of the buildings; the other for the interiors. Each will work with the owner(s) of each row house, to oversee and help with every phase of the exterior, or interior, part of the project.
2. Arrange for photos to be taken – before, during, after each phase of the project. And, with every row house.
3. Hold a “Rue de les Fleurs” la fête (party) to launch the restoration project. Publicize the event, and the project. Contact the media.

 

SELECTING EXTERIOR PAINT CREWS – A Capsule Version

 

1. Find a very skilled and agile commercial painter in the area.

A. Engage him to give the tower roofs a fresh coat of red paint. Urge him to donate his services.

B. Try to get his employer – l’contracteur – to donate the paint.

C. Let the media know about their generosities.

2. Line up the work crews – all local villagers:

A. Paint crew. Persons skilled at using a paint brush, and at least two able to use a roller.

— Find one or two skilled in using a spray system. Five able to work on ladders, and scaffolding.

B. Repair and prep crew. Fit persons: out-of-work, retired or unoccupied. Men and women.

— Include a few that are able to work on extension ladders.

C. Ground crew. Teenagers and adults, willing to help with work on the street level.

 

NEW LIFE FOR EXTERIORS OF BUILDINGS

 

1. WALLS. Clean. Scrape off old paint and loose masonry. Patch and/or fill all areas that need it. Lightly sand surfaces when dried.
2. FRONT DOORS. Clean, and scrape off old paint. Sand, patch, and paint all. Paint each door a distinctive and complementary color. TIP: Alternate deep bright blue, extra white, and crimson red (or, colors close to those of the nation’s flag).
3. HARDWARE-FRONT DOORS. Clean and polish each door’s hinges, knocker, and handle. (In the photos, they look like brass.)
4. WINDOW FRAMES, INSETS, and CORNICES. Clean, scrape, patch, sand, and reseal frames and insets of all windows. Also, window cornices and ledges. Paint to match the respective doors on street level.
5. WINDOW SHUTTERS. Remove from the buildings. Be sure to mark each shutter for building, window, and side of window. Clean, patch, fill, and sand. Paint the shutters to match the respective doors on the first story. TIP: Spraying shutters produces a much better finish, and longer-lasting coatings.
6. FLOWER BOXES. Put a few retired carpenters to work building a flower box for every window, including on each end of the row. Paint to match the respective front door on street level.
7. SEATING. Find a park bench for each front entry. Used ones are fine. Repair each, as necessary. Scrape off loose, old paint or finish. Sand till smooth. Paint all with gloss black. Or, paint each in the color that matches the respective door.

 

NOTE: Area steps 3 through 7 have entailed more than what’s outlined here.

 

PROGRESS ON THE RUE DE LES FLEURS.

 

Work on the row of inns progresses. Jean-Paul says the spirit of villagers grows. “Like the crops on surrounding farms… The townspeople prepare for a busy touriste stay season. And, the little theatre will be ready to reopen on October 16. Très bonne.”

 

PLEASE READ: Painting Them: Inns and Bed and Breakfasts on Rue de les Fleurs. Part 2: Interiors.

 

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

“Buildings, like persons, deserve special care – outside, and inside.” Jean-Paul.

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

 

Thanks for visiting “Painting with Bob.” Copyright 2015. Robert Hajtovik. All rights reserved.

 

Getting Unemployed Properties “Back to Work” – Part 2

Recently, I heard of a group of five entrepreneurs that save smaller properties, like the three men did in the Midwest. (See “Getting Unemployed Properties, Part 1.)

 

This group purchases abandoned smaller schools, rehabilitation facilities, hotels, and churches. Then, they remodel and retrofit each property to fill a specific voice in its respective community. “Usually, within a 25-mile radius.”

 

A few examples:

 

  1. One-story elementary school, north central Florida, converted into a residential facility for moderately-to-severely handicapped teens and adults.

 

  1. One-story private elementary school, in northwest Florida, turned into a non-denominational assisted living facility for low-income persons.

 

  1. Two-story hotel, in southeast Georgia, transformed into low-income rental “villas.”

 

  1. 100-room hotel, in north central Florida, retrofitted as an assisted living facility, complete with ADA-compliant pool and spa.

 

  1. One-story high school, turned into short-term rehabilitation center and permanent ALF for handicapped military veterans.

 

  1. Small church and adjoining education building, remodeled as a year-round community center.

 

Within the last five years, the group has purchased, then helped “revitalize and recycle” over 15 properties. Two persons in the group are brothers.

 

One is a cardiovascular physician and surgeon, that co-finances the group’s “property rescue projects.” The other brother is a journey-level painter, that specializes in remodeling, renovating, and retrofitting what he calls “people-public properties.”

 

The painter in the group e-mailed me about his role in getting some of these properties “back to work.”

 

“Usually, I work as both the foreman and line painter on a crew of five commercial painters. My project work can be divided into eight phases.

 

  1. Surface/area assessment – conditions and needs.
  2. Product and color estimating, selecting and ordering.
  3. Tool and equipment selecting, purchasing or renting, and keeping track of.
  4. Work area set-ups and scheduling.
  5. Painter assignments and outfitting.
  6. Painting with the rest of the crew.
  7. Troubleshooting and punch lists.
  8. Cooperating with inspectors and sign-off people.

 

“My work is time sensitive… labor and ability intensive. We rely a lot on each other. Across trade lines…. A big, learning experience for me. On every project…”

 

“The painters’ job on these projects is not to restore the surfaces to their pristine, original condition. It’s not to deal with style-conscious interior designers. And, forget trying to please the owners and investors 100 percent. (This group doesn’t expect that.) We don’t have any of them on these projects.

 

“We’re all here with the same dream: To get the property back to good use. No egos here.”

 

He closed with this motivating message…

 

“Practically anyone can do this. Pull together a few friends and relatives. Pool your brains, money and abilities. Save one building. Help some decent people in your own community.”

 

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

“Charity begins where we’re working. Where we’re standing.” rdh

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

 

Thank you for visiting “Painting with Bob.”

 

Copyright 2015. Robert D. Hajtovik. All rights reserved

Getting Unemployed Properties “Back to Work” – Part 1

One of my mother’s established clients, and two of his friends, purchased shut-down school properties. Then, the men transformed them into facilities needed in their respective communities.

 

A few examples…

 

  1. A one-story elementary school, near Lake Geneva, Wisconsin, was turned into a summer camp for boys and girls from low-income families.

 

  1. A one-story elementary school in northeastern Illinois was remodeled, then licensed as a community-owned and operated nursing home and rehabilitation center.

 

  1. A small, two-story high school, in the Chicago area, was reconfigured to serve as the new home for an overcrowded orphanage.

 

During a twenty-year span, the three entrepreneurs saved over fifty abandoned structures from demolition. In every instance, their goal was to put the property to good use in its local community.

 

For every remodeling project, local people were employed to do the work.

 

  1. A large advance crew cleared out and cleaned up the property, before any other work could proceed.

 

  1. A general contractor handled the rest of the project. That included the employment of the different types of skilled trade and craft persons needed to pull off that particular type of project.

 

The abandoned properties shared many problems.

 

  1. The buildings had been closed up at least two years, usually over three.
  2. The seasonal elements – rain, snow, ice, wind, heat, mold and mildew, etc. – had taken their toll on both the interiors and exteriors of the building(s), also the land.
  3. Sand, wild plants, wild creatures, pests of all sorts, etc. had taken up residence – and in the most unbelievable of areas/spaces.
  4. Woods had warped, rotted, cracked, and separated.
  5. Paint had chipped, faded, crackled,  and washed off many, if not all, surfaces.
  6. Wood stain had paled and turned a greenish black, or black.
  7. Varnishes had cracked and turned ugly shades of grey, or weird shades of red or yellow.
  8. Commercial grade wallcoverings had separated from their backings, and/or peeled from the walls. Then, stuck to the floors.
  9. Exterior metalwork, rails, fencing, doors, windows, frames, etc. had been beaten severely by the weather, and years of neglect. Some of it before the property had been closed down.

 

Working on any of the projects was not an painter’s idea of a dream job. Well, not for most. Even when the pay scale was high, and his or her contractor-boss was likeable, fair and accountable.

 

In July, a retired commercial painter e-mailed that he’d worked on several properties purchased by Jerry’s group.

 

“I was a moderately skilled painter on my first project done for them. I needed the job. Jerry said he saw my drive and potential. By the time we finished that first school, I’d used every skill I’d learned in apprentice school. And, I worked into a steady job, helping to save abandoned small schools, hospitals, motels, etc. Gratifying work if you can fit into it!”

 

I never knew the inventor-entrepreneur that led the small group of property benefactors. He wore many hats.

 

But, his worn coverall appearance, and laid-back, no-nonsense approach to nearly everything that he did was legendary. And, respected. Even among the infamous street gangs – eg. Hell’s Angels – that terrorized and paralyzed older neighborhoods on the northwest, west, and southwest sides of Chicago.

 

Saving shut-down and abandoned properties has become popular, as the “GO GREEN” philosophy and approach grows in North America. And, around the globe.

 

Each of us, including painters, has a role in preserving and protecting the natural resources we have. In  restoring, reviving and revitalizing properties and buildings that already exist. Especially when they are restorable or revivable.

 

Welcome any opportunity to do what you can. One of those opportunities is to repair-renovate-restore-rejuvinate-retrofit-re-use our buildings. And, the lands upon which they set.

 

Read Part 2: Painting Them: Getting Unemployed Properties “Back-to-Work.”

 

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

A painter is as entrepreneurial and innovative as the next person – including in the reviving and revitalizing of existing man-made resources.

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

Thanks, everyone, for doing your part to make this world better for others.

And, thank you for visiting “Painting with Bob.”

 

Copyright 2015. Robert D. Hajtovik. All rights reserved

Painting Them: Restoring and Reviving Hotels

Every staff member saw the hotel “looking better than it had in years.” “Since it had been built,” said a longtime employee.

 

What does it take to restore a hotel?

 

  1. A solid yet flexible plan, highly-skilled craft persons, time, and a large budget.
  2. Usually more resources than many property owners have, or want to commit.

 

What needs to be done to revive a hotel property?

 

As much as the budget will allow.

 

REVIVING A HOTEL

 

Tips from a painter that’s been there, done that. On more than seven hotel properties.

 

1. Start with the most obvious areas – noticeable to the guests and visitors.

A. Guest rooms

B. Lobby(ies)

 

Clean all areas. Touch up paint. Or “full-paint” areas to create a fresh look. A change of color, or design and placement, can be uplifting. A big benefit.

 

2. Cover the essentials.

A. Safety zones

B. High-traffic areas

C. Pools and spas – especially in hotter, humid and sunny climates

 

3. Repair – take care of – the most neglected areas.

A. High-wear areas may require weekly attention.

B. Always post “WET PAINT” signs when painting in high-traffic areas.

C. Look for permanent repair solutions for areas that receive repetitious damage or wear.

Example: Place plastic guards over corners in high-traffic areas such as a lobby.

 

4. “Clean up all of those old messes, the best you can.”

A. Cover anything that is not to be painted, located close to the work area.

B. A final vacuum of the area completes the job.

 

5. Revitalize the higher ticket areas. Get them “back on the market.”

A. Conference centers

B. Restaurants

C. Food courts

D. Gift Shops

 

6. Liven up the most popular spots.

A. Game rooms

B. WI-FI and VIRTUAL SPOTS

C. Children’s playground and activity areas

D. Outdoor recreation areas

E. Social areas

 

7. Remember key operations areas.

A. Housekeeping and Laundry

B. Physical Plant– electrical, mechanical, plumbing systems

C. Engineering and Maintenance

 

Non-guest related areas are often neglected. Yet, they and its workers are vital and valuable.

Use a variety of colors and/or graphics paint to accentuate areas that receive less attention.

It increases morale. It maintains a clean, pleasant work environment. It adds a spot of creativity.

 

Painting unfinished floors can benefit the facility’s operations areas in value-adding ways.

Painting the walls and floor accentuates the importance of the area, and persons that work there.

Painting these areas inspires anyone that works there, or passes through, to take care of the spaces, to keep them clean, and to maintain them. Even when the areas are in use 24/7.

 

Some deciding factors in every category:

 

  1. Urgency
  2. Necessity
  3. Relativity to business’s major market(s), focus and mission
  4. Owners’ and shareholders’ preferences and long-term goals
  5. Budget
  6. Availability – time lines
  7. Competition

 

No two hotel revival projects are the same. Not even when the properties are designed similarly, and owned by the same group.

 

Are you a hotel staff painter? Your involvement may vary. Depending on the area to be revived, your level of needed skills and abilities, and your time, may vary a lot.

Are you a project painter, employed by a commercial contractor? Your involvement is clear. You are put on the project because you can produce! Big time! And your skill sets, abilities and work personality fit that project.

 

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

If a task is once begun, never leave it till it’s done. Be the labor great or small, do it well or not at all!

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *      

Thanks for visiting “Painting with Bob.” Copyright 2015. Robert Hajtovik. All rights reserved.